EasyManua.ls Logo

VeriFone ruby2 - Unpacking

VeriFone ruby2
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Ruby2 Hardware Installation Guide
October 01, 2013 3
Unpacking
Carefully inspect each shipping carton and its contents for any damage that
may have occurred during shipment. If anything appears damaged,
immediately file a claim with the shipping company or carrier and notify
your VeriFone representative.
Warning:Never use damaged equipment. A shock or fire hazard may exist if
equipment is energized in a damaged condition.
Remove the following items from their respective shipping cartons:
Ruby2 Workstation, P/N M169-000-01-NAA
Ruby2 Power Supply, P/N CPS124130-3A-R
AC Power Cord, P/N CBL268-008-01-A
Cable Cover (attached to back of Ruby2)
Ruby2 Hardware Installation Guide
Software Licenses
Note: The cash drawer, customer display pole, thermal printer, and
VeriFone MX Series PINpad, which complete the Ruby2 workstation,
are ordered and shipped separately.
Remove any protective plastic wrapping from the components and place the
components on a table or countertop. Be sure that you have all the parts
required for your specific installation before you begin. Contact your dealer
if you are missing any parts.
Note: It is recommended that you keep the shipping carton and any packing
material in case it is necessary to move components from one
location to another, or to return the equipment for service.

Other manuals for VeriFone ruby2

Related product manuals