EasyManua.ls Logo

VEVOR SBC90 - Page 11

VEVOR SBC90
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 10 -
Assemble blasting gun
1. Connect sand hose (No.4) with gun(No.2), clamp (No.3)it.Connect sand pipe
(No.5) into sand hose and clamp it.
2. Connect air hose (No.8) with gun and clamp(No.7) it. Then connect air
connector (No.6), inner thread connector(No.9). Please twine 5 circles teflon tape
clockwise rotation on the air connector to avoid leakage.

Related product manuals