EasyManua.ls Logo

VEVOR SC-2 - Page 8

VEVOR SC-2
11 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
2. Lubricate the faucet piston, inside auger and outer spiral (see points A,B
and C of figure 7) only with the grease supplied by the manufacture or other
“food grade approved ”lubricant.
3. Assemble the faucet by reversing the disassembly steps(fig.6)
4.Fit bowl gasket around its seat (fig.8)
Figure 8
NOTE: The largest brim if the gasket faces the rear wall.
4.Insert the auger into the evaporator taking care to accompany it to the end so in
order to prevent it from hitting against the rear wall (fig.10).Install the outer spiral
by sliding it over the evaporator until its front notch engages with the exposed end
of the auger shaft(fig.9)

Related product manuals