EasyManua.ls Logo

VEVOR SMART1 - Page 18

VEVOR SMART1
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
1.11 Click here to send cuts
1.12 Place the material on the mat
inside the grid, position the mat
underneath the mat guides, and ensure
that the top edge of the mat is gently
secured by both rollers simultaneously.
1.13 Prompt to press the LOAD button.
1.16 Press the start
button on the machine.
1.15 Prompt to press the
start button.
1.14 Press the LOAD
button when the material
is ready.

Related product manuals