After repairing, be sure to make the following trial operation to see if the washer operates normally.
CheckPoint Inspection & Judgement
1) Insulation resistance Unplug the cord from the power outlet and turn on all the timers.Then
measure the insulation resistance between the plug (both of 2pins) and
grounding wire of themachine.
The measured value should be more than1M
Ohm
In the following case, check sufficiently.
1)Replace the electrical parts with new ones.
2)Used in a moistplace.
3)Used more than 5years.
2) Safety device Check the full stoptimeof the spin basket.
Braking time should be as follows.
3) Safety designated parts Replace withthe designated parts inthecase the used parts are not proper.
(Refer to'*"marked parts inthe parts list)
4) Wiring Check tosee ifthe lead wireisproperly connected without looseness or
overtension and taping and setting are firmlyperformed.
5) Screwsand Nuts Check toseeifthe screws,nuts, etc are firmly tightened and the screw
locks are applied.
6) Removal ofuseless
matter
Check toseeifuseless matters (Screws,bits ofwire, etc) are left inside
7)Lekage ofoiland water Check toseeifoilorwater leaks out around bellow-spinning, gear box,
motors and connection ofd.v-case.
8) Power-cord Check toseeifthe cord, the plug, the outlet etc, are not damaged. Do not
use table tape with multi-wiring.
9) Level Installation Check tosee ifthe machine installed horizontally.
Load
Normalstoptime
Noload
Ratedload
Witin7sec.
Within10sec.