9
1. Site the AC-Box on a level surface, to the left of the
heat pump with no gap between them: See Figs. 2
and 3.
2. Level the appliance with its adjustable feet.
Hydraulic connection
To prevent corrosion damage, provide all hydraulic
pipes with thermal insulation as vapour diffusion-proof
installation (on the brine and cold water sides) in
accordance with current engineering standards.
Installation sequence
Siting the AC-Box
5675 895 GB
Installation