Commissioning steps
Inspection steps
Maintenance ste ps Page
!!!
•• 21. Checking the condensate drain and cleaning the
siphon
........................................................................................
24
•• 22. Checking the neutralising system (if install ed)
• 23. Flow limiter (only for gas combination boilers).........
25
••• 24. Checking the diaphragm expansion vessel and
system pressure
••• 25. Checking the function of all safety valves
••• 26. Checking tightness of electrical connections
••• 27. Checking all gas equipment for soundness at
operating pressure
...............................................................
25
••• 28. Checking the ionisation current .....................................
26
••• 29. Checking the external LPG safety valve (if
installed)
• 30. Matching the control unit to the heating system.......
27
• 31. Connecting t he control unit to the LON system
(only for weather-compensated control units)
..........
33
• 32. Implementing a user check (in conjunction with
the LON system)
....................................................................
34
• 33. Adjusting heating curves (only for weather-
compensated control units)
..............................................
35
• 34. Instructing the system u ser ..............................................
39
• 35. Scanning and resetting the "Maintenance" display
39
Steps - initial start-up, inspection and maintenanc . . . (cont.)
6
Initial start-up, inspection, maintenance
5692 537 GB