29
Checking the diaphragm expansion vessel and system pressure
Check the diaphragm expansion vessel
pre-charge pressure at test connector
A
and recharge if required.
Note
At the top-up valves, the gas combi
boiler can be topped up using key
B
supplied.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5848 649 GB
Service