6
Commissioning steps
Inspection steps
Maintenance steps Page
• • •
1. Commissioning the system............................................................................................... 7
• •
2. Shutting down the system................................................................................................. 7
• •
3. Closing the Vitoair draught stabiliser (if installed)......................................................... 7
• •
4. Opening the boiler door and cleaning cover................................................................... 8
•
5. Cleaning the turbulators, heating surface, flue outlet and flue pipe............................. 8
• • •
6. Checking all gaskets and packing cords on the flue gas side
• • •
7. Checking the thermal insulation components on the boiler door
•
8. Inserting turbulators.......................................................................................................... 9
• •
9. Securing the boiler door and cleaning cover.................................................................. 9
• • •
10. Checking connections and sensor well on the heating water side for tightness
• • •
11. Checking the function of the safety equipment.............................................................. 10
• • •
12. Checking the expansion vessel and system pressure................................................... 10
• • •
13. Checking the firm seating of electrical plug connections and cable grommets
• • •
14. Checking the thermal insulation
• •
15. Checking the water quality................................................................................................ 11
• •
16. Cleaning the sight glass in the boiler door...................................................................... 12
• • •
17. Checking the mixer for ease of operation and tightness............................................... 12
• • •
18. Checking the function of the return temperature raising facility (if installed)
• • •
19. Checking the installation room ventilation
• • •
20. Checking the flue pipe for tightness
• • •
21. Checking the Vitoair draught stabiliser (if installed)...................................................... 12
• •
22. Adjusting the burner.......................................................................................................... 12
•
23. Instructing the system user.............................................................................................. 13
•
24. Operating and service documents................................................................................... 13
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5692 701 GB