5
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps Page
• • •
1. Commissioning the system........................................... 7
• •
2. Shutting down the system............................................. 8
•
3. Opening the boiler door and clean-out cover.............. 9
•
4. Cleaning the internal pipes, heating surface, flue
outlet and flue pipe......................................................... 10
• •
5. Checking all seals/gaskets and packing cords on the
flue gas side
• •
6. Checking the thermal insulation of the boiler door
•
7. Inserting the internal pipes, fitting the boiler door and
clean-out cover............................................................... 11
• •
8. Checking connections and sensor well for leaks on
heating water side
• •
9. Checking the function of the safety equipment........... 12
• •
10. Checking the diaphragm expansion vessel and
system pressure............................................................. 12
• •
11. Checking the tightness of electrical plug-in
connectors and cable grommets
• •
12. Checking the thermal insulation
• •
13. Checking the water quality............................................ 14
• •
14. Cleaning the sight glass in the boiler door.................. 15
•
15. Checking the mixer for ease of operation and leaks... 15
•
16. Checking the function of the return temperature
raising facility (if installed)
• •
17. Checking the installation room ventilation
• •
18. Checking the flue pipe for tightness
•
19. Adjusting the burner...................................................... 15
•
20. Instructing the system user........................................... 16
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance