Steps to be followed
Step Completed
1. Filling the heating system
2. Venting the boiler by flushing
3. Changing the gas type
4. Checking the static pressure and supply pressure
5. Removing the burner
6. Checking the burner gasket and burner gauze assembly
7. Checking and adjusting the electrode
8. Cleaning the heat exchanger
9. Checking the condensate drain and cleaning the trap
10. Installing the burner
11. Checking the diaphragm expansion vessel and system pressure
12. Checking all connections on the heating water and DHW sides for leaks
13. Checking the flue system for unrestricted flow and tightness
14. Checking the firm seating of electrical connections
15. Checking all gas equipment for tightness at operating pressure
16. Mounting the front panel
Viessmann Limited
Hortonwood 30, Telford
Shropshire, TF1 7YP, GB
Telephone: +44 1952 675000
Fax: +44 1952 675040
E-mail: info-uk@viessmann.com
Viessmann Werke GmbH & Co. KG
D-35107 Allendorf
Telephone: +49 6452 70-0
Fax: +49 6452 70-2780
www.viessmann.com
4755604 Subject to technical modifications.