CONTINUED FROM PAGE 5
6
Using the Drain Hose Kit
The Drain Hose Kit contains one 90˚ elbow and two hose
clamps. When routing to a sink, bucket, or similar recepta-
cle use the Drain Hose Kit to eliminate possible kinking of
the drain hose. Kinking can be caused by a sharp 90
˚
bend
created by the edge of a counter.
1. Once the machine is positioned on the counter, run the
drain hose from under the machine to a proper drain
receptacle.
2. Cut the hose at the point it reaches the end of the counter.
3. Place one clamp over the end of the hose coming from the
machine. Connect the two ends of the drain hose onto the
elbow of the Drain Hose Kit. The elbow should rest over the
edge of the counter.
4. Place the other clamp over the end of the hose and slide it up to the newly positioned
elbow. Position both clamps at each end of the elbow and tighten with a screw driver.
5. Reposition the PBS so that the elbow rests properly against the edge of the counter.
NOTE: If the position of the machine on the counter changes it may be necessary to replace
the Drain Hose to avoid kinks. Readily available, standard 1/2” (13 mm) plastic pipe and
fittings may be used for more complex installations.
Cleaning the Ice Bin
After removing the contents packed in the Ice Bin, an initial cleaning and sanitizing will be
necessary before adding ice. Make sure the Drain Hose is connected, and that there is
power to the machine before cleaning the Ice Bin.
• Follow steps 2-11 on page 20 ‘Care & Cleaning: Ice Bin’
Once dry, replace the Ice Shelf, Ice Chute and Splash Guard.
Filling The Machine With Ice
With the Ice Bin Lid removed and the Ice Shelf in place, you can fill the Ice Bin with up to
5 gallons (19 liters) of cubed ice.
• Using ice from an ice-making machine works best in the PBS.
• Shape and size of the ice cube will not affect the machines operation.
• Do NOT use block ice.
Clamps
Elbow
To machine
To bucket
or drain
To machine
Counter
To bucket
or drain