EasyManua.ls Logo

VOLTCRAFT SL-300 - Measurement Preparation; Operating Procedure

VOLTCRAFT SL-300
18 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
Acoustic Calibrator
REC
FAST
A/C
DC 9V
OUTPUT
CAL
6. MEASUREMENT PREPARATION
 Remove the battery cover on the back
and put in one 9V battery.
 Recover the back cover.
 When battery voltage drops below the
operating voltage or battery aging, this
symbol
will appear on LCD. Replace
the 9V battery.
When the AC adapter is used, insert the
plug of the adapter 3.5φ into the DC
9V connector on the side panel.
7. OPERATING PROCEDURE
1 Power on the meter.
2 Press ‘LEVEL’ button to select desired level,
base on ‘UNDER’ or ‘OVER’ do not appear on
LCD.
3 Select ‘dBA’ for general noise sound level and
‘dBC’ for measuring sound level of acoustic
material.
4 Select ‘FAST’ for instant sound and ‘SLOW’ for
average sound level.
5 Select ‘MAX/MIN’ button for measuring

Related product manuals