EasyManua.ls Logo

Von Duprin 98 - Installation Steps: Marking and Drilling; Step 1 & 2: Center Lines and Strike Alignment; Step 3 & 4: Hole Preparation and Marking

Von Duprin 98
9 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FAX version 911373_00(1) Page 4 of 9
1
*39-13/16
To finished
floor
RHR Shown
(LHR opposite)
2
3
4
Position template against strike
and on C and mark door.
299/299F Strike
Prepare 2 holes and install
a screw thru each slot.
299/299F Strike
C
L
C
L
Align strike on C and mark
the two slotted holes.
L
Draw horizontal device and
strike center line (C ).
L
For 499F strike, see page 9
of this instruction.
L
Roller
(against door)
Template
(align on C and
against strike)
L
C
L
A
See Screw Charton page
2 for screw types and sizes
C
L
Mark 6
holes
Mark
vertical C
L
*
For double doors with a
mullion and strike already
installed, use existing
strike center line.
#25 Drill
#10-24 tap
1/8 Drill
pilot 1 deep
MetalWood