- 17 -
Code
Description
Unit
A01
Inlet water temp.
A02
Outlet water temp.
A03
Ambient temp.
A04
Exhaust temp.
A05
Gas return temp.
A06
Outer piping temp.
A07
Inner piping temp.
A08
EEV aperture
A09
Compressor current
A
A10
Radiator temp.
A11
Voltage value
V
A12
Frequency
Hz
A13
Fan motor speed
r/min
A14
Fan motor speed
r/min
7.Adjusting and Initial operation
7.1 Attention
Open the valve of water system, inject water into the system, and exhaust air inside.
Do adjustment after electrical safety inspection.
After the power is switched on, start the test running of heat pump, to check if it can function well.
To avoid dangerous accident, the forced operation is forbidden.
7.2 Preparation Before Adjustment
The system is installed correctly.
Tubes and lines are putted in the right place.
Accessories are installed.
Ensure the smooth drainage.
Ensure the perfect insulation.
Correct connection of ground lead.
The supply voltage can meet the requirement of rated voltage.
Air inlet and outlet function can work well.
Electrical leakage protector can work well.
7.3 Adjustment Process
Check if the switch of the controller can work well.