EasyManua.ls Logo

Wacker Neuson BP1000

Wacker Neuson BP1000
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Transportation
Preparations 9.1
37
[us] | 06/2020 | 5100056974 | AS | Operator’s manual
9 Transportation
9.1 Preparations
1
2
1 Rechargeable battery
2 Lock
1. Unlock the lock 2 manually.
2. Take the rechargeable battery 1 out of the machine before trans-
port.
9.2 Lifting the machine
NOTICE
Designate a competent instructor for a safe lifting procedure.
1
2
1 Central suspension
2 Guide bracket
1. Attach suitable sling to central suspension 1 for lifting the machine.
2. Carefully load the machine into or onto a stable and stable means of
transport.
3. Move the machine laterally.
9.3 Lashing the machine
1
1
9

Table of Contents

Related product manuals