EasyManua.ls Logo

Wacker Neuson BPU 3545A

Wacker Neuson BPU 3545A
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
T00806GB
15
MAINTENANCE
Maintenance schedule
Check all external screw connections for tight fit approx. 8 hours after first operation.
Parts Maintenance jobs Maintenance interval
Air filter Check for external damage and tight fit. daily
Check filter cartridge, clean or replace if necessary.
Fuel tank Check tank lid for tight fit, replace if necessary.
Drive engine Check oil level, top up if necessary.
Exciter Check for tightness.
Drive engine First oil change. 20 hours
Centre pole Grease moveable locking device, and spindle or pole monthly
height adjustment.
Drive engine Clean spark plug, check spark plug gap 0,7 mm.
Centre pole head Check oil level, top up if necessary.
V-belt Check V-belt tension - retension, if need be.
Protective frame Check fastening screws of protective frame and
central suspension for tight fit.
Drive engine Oil change. 100 hours
Exhaust muffler Remove combustion residue from spark arrester.
Exciter Oil change.
Exciter Check oil level-fill up, if need be. 150 hours
Exciter Oil change. 250 hours
Drive engine Valve clearance - Check, set - 0,15 mm 300 hours
intake valve, 0,20 mm exhaust valve.

Related product manuals