EasyManua.ls Logo

Wacker Neuson Trowel CT 24-4A

Wacker Neuson Trowel CT 24-4A
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation CT 24-4A
20 wc_tx001521gb.fm
4 Operation
4.1 Preparing for First Use
Preparing for first use
To prepare your machine for first use:
4.1.1 Make sure all loose packaging materials have been removed from the
machine.
4.1.2 Check the machine and its components for damage. If there is visible
damage, do not operate the machine! Contact your Wacker Neuson
dealer immediately for assistance.
4.1.3 Take inventory of all items included with the machine and verify that
all loose components and fasteners are accounted for.
4.1.4 Attach component parts not already attached.
4.1.5 Add fluids as needed and applicable, including fuel, engine oil, and
battery acid.
4.1.6 Move the machine to its operating location.
4.2 New Machine Set-up
Trowels are shipped from the factory with the handle folded. Follow
instructions on Installing Blades and Unfolding Handle when setting up
new machines or when installing new blades.
4.3 Recommended Fuel
The engine requires regular grade unleaded gasoline. Use only fresh,
clean gasoline. Gasoline containing water or dirt will damage fuel
system. Consult engine owner’s manual for complete fuel
specifications.