EasyManua.ls Logo

Wacker Neuson Trowel CT 24-4A

Wacker Neuson Trowel CT 24-4A
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CT 24-4A Operation
wc_tx001521gb.fm 27
Do not attempt to clean, service or perform adjustments on the trowel
while it is running.
4.13 Emegency Shutdown Procedure
Procedure
If a breakdown or accident occurs while the machine is operating,
follow the procedure below:
4.13.1 Stop the engine.
4.13.2 Close the fuel valve
4.13.3 Remove the machine from the job site using correct lifting techniques.
4.13.4 Clean concrete from the blades and the machine.
4.13.5 Contact the rental yard or machine owner for further instructions.
wc_gr004418
a
b
c
d