5.0 INSTALLATION AND FIXING
2
EXT.SBB-HFF.--.M.A.0219.EN Issue: A
02.19
30
SBB-HFF
13) Lift the machine as shown in the gure, position it in
the nal arrangement and secure it to the ground.
Then proceed with the wiring of the electric vibrator
(see section on page …)
Assembling C Type is similar to S Type except for the upper frame.