EasyManua.ls Logo

WAMGROUP SBB-HFF - Page 38

Default Icon
57 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.0 INSTALLATION AND FIXING
2
EXT.SBB-HFF.--.M.A.0219.EN Issue: A
02.19
34
SBB-HFF
9) Fix the beam 3 for the hoist on hoist frame using the 8
M20 bolts and tighten the assembly rmly.
10) Using a suitable crane or forklift truck lift the entire
block A and position it on top of the hopper frame B
taking care to align the holes of the connecting anges.
Insert the connecting bolts and tighten them.
Now tighten all the bolts of the chassis and carry out a
nal check on all the bolts to make sure they are tight-
ened perfectly.
Important
Use a torque wrench to ensure the following tightening torques:
M16 screws: 225 Nm
M18 screws: 439 Nm