EasyManua.ls Logo

WarmFlow 90/120 - Two Pipe and De-aerator Oil Systems; Two Pipe Oil System; De-aerator Oil System

Default Icon
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9.8 Fitting a Slimline Kabin Pak Vertical Flue Adaptor
Remove the flue terminal (4 screws) and fit the adaptor as shown (4 screws).
FLUE TERMINAL
VERTICAL
FLUE ADAPTOR
Note: Where there is a possibility of air being trapped in the boiler the installer must ensure
that the automatic air vent is fitted to the boiler.
Page 31

Table of Contents

Other manuals for WarmFlow 90/120

Related product manuals