Benchmark Platinum-Edge: Operation-Service Manual
SECTION 3 - START SEQUENCE
OMM-0137_D • GF-211 • 7/16/2019 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page 24 of 146
3.4 START/STOP LEVELS – AIR/FUEL & ENERGY INPUT
The Tables below show the relationship between the energy input and Air/Fuel Valve position
for the BMK models covered in this document.
3.4.1 BMK 750/1000 Air/Fuel Valve Position and Energy Input
TABLE 3-2a: BMK 750/1000 Air/Fuel Valve Position – NATURAL GAS
AIR/FUEL VALVE
POSITION (%
OPEN)
ENERGY INPUT
(BTU/HR)
BOILER ENERGY
INPUT (% OF FULL
TABLE 3-2b: BMK 750/1000 Air/Fuel Valve Position – PROPANE GAS
Air/Fuel Valve
Position (%
Open)
Energy Input
(BTU/Hr)
Boiler Energy Input
(% of Full Capacity)