20
WeCo Srl Italy www.wecobatteries.com 4K4LT V1.00 24/01/2023
5.3.2 Installation of the floor tower
5.3.2.1 Installation of accessories and preparatory steps
Step 1: Choose your table top carefully: the batteries weigh about 50 kg each and a tower of five batteries can reach 270 kg including
accessories.
Ensure that the support surface is adequate to support the overall battery load.
The maximum number of stackable units is five (5).
Preparation of modules
L and battery are supplied as standard in wall configuration, and it is therefore necessary that the installer makes simple external
changes to install them in STACKABLE CONFIGURATION.
INSTALLATION PROCEDURE IN STACKABLE CONFIGURATION
Step 1: If the batteries are to be stacked, the rear bracket will not need to be installed.
For stacked installations (STACK) do not install any bracket or screw on the back of the batteries.
The rear surface must be free from any object otherwise it could damage the underlying battery or be a hindrance due to the possible
passage of cables in the space between the floor and the lower part of the first battery.