EasyManua.ls Logo

WeiderPro Pro 4000 - Page 12

WeiderPro Pro 4000
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
18. Identify the High Cable (55). Route the Cable
up through the Top Frame (4) and over a 90mm
P
ulley (48). Attach the Pulley inside of the Top
Frame with an M10 x 78mm Button Bolt (71),
t
wo M10 Washers (57), two 19mm Spacers
(33), and an M10 Nylon Locknut (56).
20. Wrap the High Cable (55) under a 90mm Pulley
(48). Attach the Pulley and two Half Guards
(43) at the upper hole in the Adjustable “U”-
bracket (45) with an M10 x 45mm Button Bolt
(81) and an M10 Nylon Locknut (56). Make
sure that the Half Guards are on the outside
of the Adjustable “U”-bracket.
21. Route the High Cable (55) up through the Top
Frame (4) and over a 90mm Thin Pulley (47).
Attach the Thin Pulley inside of the Top Frame
with the M10 x 78mm Button Bolt (71) used in
step 19, a 19mm Spacer (33), an M10 Washer
(57), and an M10 Nylon Locknut (56).
19. Route the High Cable (55) over a 90mm Thin
Pulley (47) and down through the Top Frame
(4). Attach the Thin Pulley inside of the Top
Frame with an M10 x 78mm Button Bolt (71), an
M10 Washer (57), and a 19mm Spacer (33).
Make sure that the Thin Pulley does not fall
out of the Top Frame while you complete
steps 19 and 20.
18
19
20
21
5
6
4
5
5
33
3
3
57
57
48
71
4
55
33
57
47
71
81
56
48
55
43
43
45
55
47
71
4
33
57
56

Other manuals for WeiderPro Pro 4000

Related product manuals