MAINTENANCE CHECKLIST
WEEKLY CHECKLIST
(or after 48 hours of continuous operation)
ENSURE THE MACHINE HAS BEEN TURNED OFF LOCKED OUT / TAGGED OUT AND THAT ALL COMPONENTS ARE COOL
TO THE TOUCH BEFORE PERFORMING MAINTENANCE ON PARTS.
1
ST
WEEK
2
ND
WEEK
3
RD
WEEK
4
TH
WEEK
BUTTONS
Inspect and test safety switches
and emergency stop button
VISUAL INSPECTIONS
Visual inspection of Pneumatics,
check for air leaks.
Visual inspection of Printer, check
printer ribbon. Replace if needed.
Visual inspection of Carriage,
check for signs of damage to
Rollers
Visual inspection of Gearbox,
check gearbox for oil leaks
FILM ROLL
Check that Film Roll moves freely
CUTTING KNIFE
Wipe Knife, check that knife is free
of plastic residue and undamaged
after cleaning.*
TEFLON TAPE
Clean Teflon Tape, ensure that
tape is not worn down and check
for heat damage. Tape should be
smooth, not discolored and scratch
free.*