EasyManua.ls Logo

Welger E-LINK RP 235 - 1 Introduction; 2 Requirements on the Machine

Welger E-LINK RP 235
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WELGER RP 235 • E-LINK 5
1 Introduction
The control contains (see figures bellow):
the control box E-LINK (hand set)
the control unit Balercontrol III
The control box E-LINK serves for operating the machine.
The control unit Balercontrol III is directly attached to the machine in a solid housing.
The control unit and the control box, as well as the respective software contained therein, are provided
with their own serial numbers. Always state the serial numbers for possible requests. Please enter this
numbers here immediately after delivery:
Part Serial number How to find the serial number
E-LINK control box
SW rev. ...........................
dd ...........................
Keep any key on the control box
pressed when connecting the
power supply.
Control unit
Balercontrol III
Serial no. ...........................
SW version ...........................
SW date ...........................
Memory ...........................
Operate button
several times
until "Systeminfo" is displayed (see
chapter „"Systeminfo" menu,
page23).
2 Requirements on the machine
On-board power supply .................... 12 V
Fuse protection, machine side:......... 20 A
Operation with 24 V power supply is not permissible.

Table of Contents