34 WILOSE04-2015V05DINA4
English INSTALLATION
NOTE
To function correctly, 2 bridges (supplied) must
beinstalledonthemainsterminalstrip:
• Terminal 1 and 2
• Terminal 3 and 4
• Mainsconnection3~400V:
• Cable:5-core
• Terminals:2/T1(L1),4/T2(L2),6/T3(L3),N(N)
• The protective earth conductor (PE) is connect-
ed to the earth terminal (;).
• DIPswitch2:DIPposition"1":ON(topposition)
• A clockwiserotatingeldmustbepresent!
5.4.3. Switchgear mains connection - with plug ("S"
version)
Inserttheplugintothesocket:
• Mainsconnection1~230V:Shock-proofsocket
• Mainsconnection3~400V:CEEsocket(aclock-
wiserotatingeldmustbepresent)
5.4.4. Switchgear mains connection - without main
switch and plug ("O" version)
Insert the cable ends of the power supply cable
laid on-site through the threaded cable connec-
tions and secure them accordingly.
Connect the wires on the mains terminal strip as
follows:
• Mainsconnection1~230V:
• Cable:3-core
• Terminals:L1(L),N(N)
• The protective earth conductor (PE) is connect-
ed to the earth terminal (;).
• DIPswitch2:DIPposition"1":OFF(bottom
position)
NOTE
To function correctly, 2 bridges (supplied) must
beinstalledonthemainsterminalstrip:
• Terminal 1 and 2
• Terminal 3 and 4
• Mainsconnection3~400V:
• Cable:5-core
• Terminals:L1(L1),L2(L2),L3(L3),N(N)
• The protective earth conductor (PE) is connect-
ed to the earth terminal (;).
• DIPswitch2:DIPposition"1":ON(topposition)
• A clockwiserotatingeldmustbepresent!
5.4.5. Pump mains connection
Insert the cable ends of the pump power supply
cables laid on-site through the threaded cable
connections and secure accordingly.
Connect wires as follows to the motor protection
fortherelevantpump(P1,P2):
• Pumpconnection1~230V,3-corecable:
• Terminals:4/T2(L),6/T3(N)
• The protective earth conductor (PE) is connect-
ed to the earth terminal (;).
NOTE
Withthe"S"versionthepumpisconnectedat
terminals 2/T1 (L), 4/T2 (N).
• Pumpconnection3~400V:
• Terminals:2/T1(U),4/T2(V),6/T3(W)
• The protective ground conductor (PE) is con-
nected to the earth terminal (;).
• A clockwiserotatingeldmustbepresent!
After the pumps have been connected correctly,
the pumps need to be activated and the motor
protection adjusted.
Activating pumps
The connected pumps have to be switched on via
DIPswitch2,DIP6and7.Thefactorysettingfor
the DIP switches is OFF. Level-control dependent
activation of pumps is not possible in this setting.
• DIP6ON:Pump1activated
• DIP7ON:Pump2activated
Adjusting the motor protection
The electronic motor protection monitors the
rated current of the connected pumps during
operation. Deactivation takes place immediately
ifthesetratedcurrentisexceeded.
NOTE
With connection of 3-phase current motors,
deactivation also occurs after 1 sec. if the rated
currentdropsbelow300mAduringoperation!
After each deactivation, the fault needs to be
acknowledgedviathe"Reset"button.
The motor protection needs to be set to the rated
current shown on the rating plate.
The desired rated current is set via DIP switch 1,
DIP1-5.Thelowestcurrentvalueis1.5Ainwhich
all DIP switches are set to OFF position. On acti-
vating the individual DIP switches (ON position),
the current value is increased by the value of the
relevant DIP switch.
DIP
1 2 3 4 5
Current value
0.5A 1.0A 2.0A 3.0A 4.0A
Example:Requiredratedcurrent7.5A
1.5A+2.0A(DIP3)+4.0A(DIP5)=7.5A
5.4.6. Winding temperature monitoring connection
Bimetallic strips may be connected for tempera-
ture monitoring.
Monitoring is self-acknowledging, meaning that
after the motor has cooled down the error is reset
automatically and the LED goes off.
Connect the wires to the terminals for the corre-
spondingpumpattheterminalstrip:
• Pump1:Terminal1and2(WSK-P1)
• Pump2:Terminal3and4(WSK-P2)