Gateway Ceiling Mount Installation (recommended)
Step 3 – Where the cable pass thru
hole was traced, drill, using a hole
saw, a 1"-1½" diameter hole through
the roof and ceiling of the vehicle.
Be careful not to damage any wiring
between the roof and ceiling.
Do not exceed 1½".
Step 4 – Replace the dome. Verify
the dome holes align with the base
holes. Ensure the dome and gasket
are completely tight and screw in the
four Phillips screws.
Step 5 – Connect the provided 20’ coax
cable to the coax cable that exits the base
of the Air 360
+
. If replacing an existing antenna, connect the coax cable that
is already ran to the coax cable that exits the base of the Air 360
+
.
Step 6 – Feed all 4 cables (Coax, Yellow, Green, and Red) into the roof of the RV.
Note: The coax cable will need routed wherever the antenna wall plate/power
supply is going to be installed.
Step 7 – It is recommended to use Butyl tape (not included) for extra
protection under the entire base flange before screwing to the roof. Reposition
the base of the antenna in the location you intend to mount with the flange
indicating FRONT facing the front of the vehicle. Screw in 6 mounting screws
into the 6 mounting holes around the flange of the base and into the roof.
Step 8 – Next, add approved sealant (check with RV Manufacturer) completely
around the flange base and over each screw.
WARNING: Ensure the gasket of the dome is complete sealed and that there
are NO gaps between the sealant and the base of the Air 360
+
. Failure to do
so could lead to water damage in the RV.
> If planning to install the Winegard Gateway now or at a later time:
Step 9 – Run the Gateway power cable from the hole where the three
antenna cables (Yellow, Green, and Red) enter the ceiling of the RV to the
predetermined location of the Gateway wall plate/power supply. The white
connector of this power cable should be at the same location as the Yellow,
Green, and Red connectors. The Winegard Gateway will use this power cable.
The bare wires of this power cable should be routed to where the On/Off
switch will be for the Winegard Gateway extender.