EasyManuals Logo

WMF espresso User Manual

WMF espresso
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
Installation and start-up 6
1 Installation and start-up
1.1 Customer’s on-site connection requirements
Necessary preparatory work for electricity, water and drainage connections at the customer‘s premises are to be arranged by the machine owner/operator.
The work must be carried out by authorised installation technicians in compliance with general, country-specific and local regulations.
The WMF Service engineers may only connect the coffee machine to existing prepared connection points.
WMF Service is neither authorised nor responsible for carrying out any work on-site prior to connection.
For details, see the planning information on the website www.wmf-kaffeemaschinen.de

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the WMF espresso and is the answer not in the manual?

WMF espresso Specifications

General IconGeneral
Product TypeEspresso Machine
BrandWMF
Pressure15 bar
MaterialStainless Steel
FeaturesAutomatic milk frother, removable water tank

Related product manuals