COMMISSIONING
6 720 648 726 (2011/07)
59
10.5 COMMISSIONING RECORD LOG BOOK
B Enter your signature and the date after completing the start-up activities.
Start-up activities Page
Measurement
results Remarks
1. Filling and pressure testing the heating system.
• Pre-pressure expansion vessel (refer to the
installation instructions for the expansion vessel)
• Heating system filling pressure
47
47
_____________bar
_____________bar
2. Write down the gas characteristics: Wobbe-index
Operating heat value
_____________kWh/m³
_____________kWh/m³
3. Checking for gas leaks 49
4. Bleeding the gas flow pipe 50
5. Checking the flue gas connection 51
6. Checking the appliance configuration 51
7. Measuring the gas supply pressure (working pressure) 51 _____________mbar
8. Checking and adjusting the gas/air ratio 51 _____________Pa/mbar
9. Carrying out a leakage check in operating conditions 54
10. Measuring the carbon monoxide content (CO), air free 55
11. Function testing
Measure the ionisation current
55
55
_____________μA
12. Boiler settings 56
13. Closing and locking the boiler door 58
14. Informing the user, handing over technical documents 58
Confirming proper commissioning
Company stamp/signature/date
Table 19