EasyManuals Logo

Worcester GREENSTAR 35 CDi User Manual

Worcester GREENSTAR 35 CDi
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #30 background imageLoading...
Page #30 background image
COMMISSIONING
6 720 812 175 (2014/07)30
5 COMMISSIONING
5.1 PRE- COMMISSIONING CHECKS
1. Check that the service and water pipes are connected to the correct
position on the manifold.
A - CH flow (22mm)
B - CH return (22mm)
C - Gas inlet (22mm)
D - Cylinder outlet (15mm) if the optional diverter valve is used.
E - Cylinder inlet (15mm) if the optional diverter valve is used.
Fig. 42
2. Check the gas type specified on the identification plate (F) matches
that of the gas supply. Turn on the main gas supply, check the gas pipe
work, connections and rectify any leaks.
Fig. 43
3. Check that the pressure relief connector, located on the right hand
side at the bottom of the wall frame, in its up position.
Fig. 44
4. Check that the condensate pipe has been connected to the adapter
Fig. 45
5.2 FILLING THE SYSTEM
1. Ensure all system and boiler drain points are closed.
2. For sealed systems fill the system using a WRAS approved filling loop
to a pressure of1 bar.
3. Vent all radiators, retighten when completed and check the system
and correct any leaks.
The boiler integral expansion vessel is precharged to 0.75bar (equal
to a static head of 7.5meters [22ft]). A Schraeder type valve is fitted
to the expansion vessel to allow for pressure adjustment if required.
If an extra expansion vessel is fitted to the central heating return,
adjust to the same pressure as the appliance internal expansion tank,
refer to separate instructions with the extra expansion vessel.
4. Briefly open the pressure relief valve to test its operation.
5. Refill the system up to 1 bar.
GAS SUPPLY
Open gas cock on the boiler and purge the gas supply to the boiler
ensuring that the room is well ventilated.
Test gas supply for soundness as described in
BS 6891.
CAUTION: MAINS SUPPLIES
Isolate the mains supplies before starting any work
and observe all relevant safety precautions.
BCA
22mm 22mm 22mm
BC
A
22mm
D
15 mm
22mm
E
15 mm
22mm
5
6720647742 201W
2.
F
NOTICE: If the boiler is not to be commissioned
immediately then: after successfully completing all of
the checks and any rectification work, close the gas and
water valves, shut off the gas supply and electrically
isolate the boiler.
3.
Stop in
locked
position
6 720 812 175-12.1O
4.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Worcester GREENSTAR 35 CDi and is the answer not in the manual?

Worcester GREENSTAR 35 CDi Specifications

General IconGeneral
BrandWorcester
ModelGREENSTAR 35 CDi
CategoryBoiler
LanguageEnglish

Related product manuals