REQUIREMENTS
For A
Successful Clutch Installation
Two Critical Requirements:
1. Anti-rotation device must allow both axial and radial free-play!
Failure to allow this free-play will result in field bearing failure.
The greater the restriction the faster the bearing will fail!
2. Mounting bolt torque, 7/16 – 20 bolt torqued to 50 – 55 ft. lb.
Failure to adhere to these specifications will result in the failure of the
clutch!
Engaging Clutch:
¾Set throttle at no more than ¾ speed. Engaging the clutch at high speed will
shorten the electric clutch life. Never engage clutch if mower deck is
plugged with grass or other material. Once clutch is engaged, increase
speed to full throttle for mowing.
Disengaging clutch:
¾Set throttle at no less than ½ speed. Disengage by pressing PTO switch in.
NOTES:_____________________________________________________
____________________________________________________________
____________________________________________________________
____________________________________________________________
____________________________________________________________
____________________________________________________________
____________________________________________________________
____________________________________________________________
47