Unpacking and Installation, TWTA Octagon CPU
MNC-0300-003 5 of 22 Revision N
Unpacking and Installation, TWTA Octagon CPU
Note
This document is intended for outdoor TWTAs and
other related products with Octagon microprocessors.
Unpacking and Inspection
Inspect the inside and outside of the shipping container for signs
of damage. If any shipping damage is detected, call the shipping
carrier and submit a damage report.
Unpacking
Compare the packing list to the contents of the container to be
certain that all enclosed material has been received. Save all
data sheets. They will be useful during any maintenance
actions. Save the shipping container and packing material and
use it if you need to reship the unit.
Inspection
Inspect all items for any damage received during shipment. If
shipping damage is detected, submit a damage report to the
shipping carrier. Failure to submit a report may invalidate any
future claims.
Mechanical Installation
Some units have mounting brackets supplied to mount the
amplifier. Refer to the appendix titled Mechanical Drawings.
When performing the procedures in this section refer to the
Outline Drawings and Interconnect Drawings for your specific
amplifier. These drawings are located in appendices titled
Mechanical Drawings and Interconnect Drawings.