EasyManua.ls Logo

XSPC X2O - Final Installation; Maintenance and Support; Maintenance

Default Icon
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.7 - Final Installation
Once the CPU water-block is in place you are ready to re-install the radiator and pump into your case.
Please take care not to put unnecessary force on the tubing connectors while moving the components.
Finally connect the fan and pump to the 3pin headers on the motherboard or to a 4 pin molex connector
using the provided adapters.
Once all the components are secured in place, your system is ready for use.
4.1 - Maintanance
To ensure correct operation after installation it is recommended that you do the following:
Inspect the system for leaks on a regular basis
Check the water level regularly and top up in necessary
Drain the system and replace the liquid every 8-12 months
Keep tubing out of direct sunlight
Only use in enviroments between 0C and 40C
Remove dust from the radiator to avoid loss of airflow
Page 10/12

Related product manuals