EasyManua.ls Logo

Yale PINTR634SS

Yale PINTR634SS
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
List of Materials
Removing the packaging.
I CAUTION
Remove carton carefully, Wear gloves to protect against sharp
edges.
I WARNING
Remove the protective lm covering the product before putting
into operation.
Supplied Part Pieces Supplied Part Pieces
Hood assembly with blower and
LED lamps already installed
1
Side spacers
2
5x45 mm
4
4x8 mm
10
10” round air transition
1
Grease lters
30”, 36”: 2
48”: 3
Parts not supplied
Tools/Materials required
Level
Drill
1¼” (3 cm) drill bit
⅛” (3 mm) drill bit
Pencil
Wire stripper or knife
Tape measure or ruler
Pliers
Caulking gun and weatherproof caulking compound
Vent clamps
Jigsaw or keyhole saw
Flat-blade screwdriver
Metal snips
Phillips screwdriver
Parts needed
Home power supply cable
½” (12.7 mm) UL listed or CSA approved strain relief
3 UL listed wire connectors
1 wall or roof cap
Metal vent system
Optional Accesories
KIT Part #
PINSV628SS
PINTR628SS
PINTR634SS
PINSV134SS
PINTR146SS
CFM Reduction Kit ACC0185752** ACC0185099***
10" to 8" Transition Kit ACC0185271*
Kit No Blower External ACC0179547
Kit No Blower In Line ACC0179549
*There are no HVI certied ratings available for the 8" transition
Kit conguration, please check with local building codes in order
to verify compliance without HVI certication.
** CAUTION: When using this CFM reduction kit, the maximum
BTU use for this hood is 65 KBTU’s.
*** CAUTION: When using this CFM reduction kit, the maximum
BTU use for this hood is 78 KBTU’s.

Related product manuals