EasyManua.ls Logo

YASKAWA AQ6370B - Page 42

YASKAWA AQ6370B
383 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-9
IM 735302-01E
Preparing for Measurement
1
2
3
4
5
6
7
8
9
10
11
App
Index
Power On and Screen Display
1.
Connect the power cord to the power cord connector on the back side of the
instrument.
OFF
MAIN POWER
ON
100
-
240V
AC
150VA
MAX
50/6 0Hz
FUSE
250V
T
5A
3-prong outlet
Power cord
(accessory)
3-2 prong adapter
(Japan only)
Protective
grounding
terminal
2.
Turn ON the MAIN POWER switch on the rear panel of the instrument. The
POWER switch on the front panel of the instrument lights orange.
OFF
MAIN POWER
ON
100
-
240V
AC
150VA
MAX
50/60 Hz
FUSE
250V
T
5A
3.
Press the POWER switch on the front panel of the instrument. The color of
the switch turns from orange to green. The operating system starts up, and
initialization of the instrument begins.
USB
POWER
The initialization screen appears, and the internal initialization process starts. STEP
1/9 through STEP 9/9 are displayed in the lower right part of the screen to indicate
the progress of initialization.
CAUTION
Do not press the POWER or MAIN POWER switches while initialization is in
progress.
Doing so can cause malfunction.
3.4 Turning the Power ON/OFF

Table of Contents