Sensor installation
General Instruction Manual
Installation
IM 01U10B00-00EN-R, 3rd edition, 2018-07-09
29 / 90
Fixing the flange
Use screws and nuts suitable for the flanges.
In case the nominal width of the piping deviates from the flow meter, use the appropri-
ate reductions.
Inner gasket diameters should not fall below the inner diameters of the flange.
3
1
2
4
5
Fig.22: Fixing the flange
1 Pipe flange
2 Gasket
3 Sensor flange
4 Bolt
5 Nut
Internal thread
connection
For process connections with an internal thread, the connection must be installed in ac-
cordance with the following figure.
1
2
3
Fig.23: Internal thread connection
1 Sensor
2 Gasket (not use in case of NPT)
3 Pipe

Table of Contents

Other manuals for YOKOGAWA Rotamass Prime

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the YOKOGAWA Rotamass Prime and is the answer not in the manual?

YOKOGAWA Rotamass Prime Specifications

General IconGeneral
BrandYOKOGAWA
ModelRotamass Prime
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals