PART 3 – EXECUTION
3.01 INSTALLATION
A. General: Rig and Install in full accordance with Manufacturers requirements, Project
drawings, and Contract documents.
B. Location: Locate chiller as indicated on drawings, including cleaning and service main-
tenance clearance per Manufacturer instructions. Adjust and level chiller on support
structure. If equipment provided exceeds height of scheduled chiller, installing contrac-
tor is responsible for additional costs associated with extending the height of parapet
or screening walls/enclosures
C. Components: Installing Contractor shall provide and install all auxiliary devices and
accessories for fully operational chiller.
D. Electrical: Coordinate electrical requirements and connections for all power feeds with
Electrical Contractor.
E. Controls: Coordinate all control requirements and connections with Controls Contrac-
tor.
F. Finish: Installing Contractor shall paint damaged and abraded factory nish with touch-
up paint matching factory nish.