1034350-UCL-D-0817
Unitary Products Group 3
REFERENCE
General Inspection Completed See Notes
Unit inspected for shipping, storage, or rigging damage
Unit installed with proper clearances
Unit installed within slope limitations
Refrigeration system checked for gross leaks (presence of oil)
Terminal screws and wiring connections checked for tightness
Filters installed correctly and clean
Condensate drain trapped properly, refer to Installation Manual
All field wiring (power and control) complete
Refrigerant Line Inspection System 1 System 2
Is Condenser below Evaporator? Yes
No
Yes
No
Total Line Length end to end. _______ Ft. _______ Ft.
Vertical Lift in Ft. _______ Ft. _______ Ft.
Vertical Fall in Ft. _______ Ft. _______ Ft.
Number of Elbows? _______ Ea. _______ Ea.
Liquid Line Size _______ Ea. _______ Ea.
Suction Line Size _______ Ea. _______ Ea.
Solenoid Valve? Yes
No
Yes
No
Check Valves? Yes
No
Yes
No
Check Valves / Solenoid arrangements installed as per UPG Piping Guide Yes
No
Yes
No
Oil Separator ? Yes
No
Yes
No
Accumulator ? Yes
No
Yes
No
TXV - Hard shutoff Yes
No
Yes
No
Heatpump Yes
No
Yes
No
Air Moving Inspection Completed See Notes
Alignment of drive components
Belt tension adjusted properly
Blower pulleys tight on shaft, bearing set screws tight, wheel tight to shaft
Pressure switch or transducer tubing installed properly