628792-BTG-G-0418
16 Ducted Systems
Piping And Electrical Connections
Piping connections are made from the rear of the unit. Connections can be made directly to the suction and liquid line service
valves.
Piping can be routed to the unit from the left or right side.
Electrical connections for power and control wiring is made from the front of all units, left of the electrical control box access.
See piping sizes and electrical knockout details.
YJ Unit Dimensions
Unit Dimensions (Inches)
Model ABCDEFGH
YJ-30 128.5 88.5 37.5 41.8 40.0 46.1 37.1 23.6
YJ-40 128.5 88.5 57.7 41.8 40.0 46.1 37.1 23.6
YJ-50 128.5 88.5 57.7 41.8 40.0 46.1 37.1 23.6
Unit Clearances
Location Dimensions
Overhead (Top)
1
1
Units must be installed outdoors. Overhanging structures or
shrubs should not obstruct condenser air discharge.
120”
Front access panels 36”
Left Side 30”
Right Side 30”
Rear 24”
Bottom
2
2
Adequate snow clearance must be provided if winter operation
is expected.
0”
E
D
A
FRONT
B
REAR
RIGHT
LEFT
C
F
G
H