95JOHNSON CONTROLS
FORM NO.: 6U6K-B01E-NB-EN
Apply 230VAC and verify its value between terminals.
The voltage should be 230VAC +/- 10%.
................................................................................
NOTE: Power must be applied 8 hours prior to start-up.
Each heater should draw approximately 2A.
START-UP CHECKLIST
CUSTOMER:
ADDRESS:
PHONE:
JOB NAME:
LOCATION:
CUSTOMER ORDER NO:
JCI TEL NO:
JCI ORDER NO: JCI CONTRACT NO:
UNIT MODEL NO: UNIT SERIAL NO:
The work (as checked below) is in process and will be completed by: / /
Month Day Year
The following work must be completed in accordance with i nstallation instructions:
A. CHECKING THE SYSTEM PRIOR TO INITIAL
START (NO POWER)
Unit Checks
Excessiveflowmay cause catastrophic
damage to the heat exchanger
(evaporator).
B. COMPRESSOR HEATERS
(POWER ON 8 HOURS PRIOR TO START)
YMPA0045-0260
YMAA0045-0260
1.Unit checked for shipping damage. .......................
NOTE: Any damage MUST be reported to Johnson
Controls immediately for inspection.
Initials:
Company Name:
Date:
2.Unit assembled (if shipped dismantled) and refriger-
ant piping installed. ..................................................
3.Visually check for refrigerant piping leaks. ............
4.Open suction line ball valve and discharge line ball
valve for each system. .............................................
5.If hydro kit is selected, check for the wirings between
pump and control panel. ..........................................
6.If the water pump is field installed, check and adjust
water pump flow rate and pressure drop across the
unit. Verify flow switch operation...............................
7.Check the control panel, VSD panel and HMI panel
to ensure they are free of foreign material (wires,
metal chips, etc.). .....................................................
8.Visually inspect wiring (power and control). Wiring
MUST meet CE and local codes...............................
9.Check tightness of power wiring inside the power
panel on both sides of the motor contactors and
overloads..................................................................
10.Check for proper circuit breakers in main and
control circuits, and verify overload setting
corresponds with RLA and FLA values. Refer to
Electrical Data in the ICOM or unit nameplate.
.................................................................................
11.Be certain all water temp sensors are inserted
completely in their respective wells and are coated
with heat conductive compound...............................
12.Assure that all solenoid coils (EEVs, reverse
valves) are properly installed and firmly fixed. Be
aware of the systems of dual circuit units.................
SECTION 6 – COMMISSIONING