Key safety warnings and cautions regarding unit installation and operation.
Warning about fire or explosion risk due to improper handling of flammable vapors.
Warning about personal injury or property damage from improper installation.
Detailed explanation of each component of the unit model number.
Essential safety information to read before starting installation.
Warning regarding fire or explosion risk during installation procedures.
Lists relevant electrical, fuel gas, and building codes for installation.
Warning about damage or injury from contaminated combustion air.
Warning against obstructing condenser air discharge or combustion air inlets.
Specifies clearances needed for operation and service.
Caution regarding R-410A refrigerant and system compatibility.
Caution about adjusting transformer taps for different voltage supplies.
Caution to use water-proof connectors for wiring to prevent moisture ingress.
Diagram illustrating typical thermostat and control board wiring connections.
Warning about using proper pipe dope with natural gas due to solvent properties.
Warning against using open flames for gas leak detection.
Warning to use specific compounds for LP gas piping to prevent dissolution.
Warning on suitable pipe dope for natural gas to prevent damage.
Hazard warning for fire or explosion from improper gas handling.
Detailed description of the cooling system's operational sequence.
Detailed steps for the first stage of gas heating ignition and operation.
Detailed steps for the second stage of gas heating ignition and operation.
Conditions that cause a gas heating lock-out and how to reset.
Essential checks before starting the cooling system.
Initial operating steps after completing cooling start-up.
Checks to perform after the heating section is operating.
Procedure for measuring and verifying gas heat input rates.
Steps to measure gas flow for second stage heating input.
Procedure for adjusting gas pressure regulators for optimal input.
A checklist of items to verify before and during equipment start-up.
Instructions on using LCD or MAP Gateway for start-up.
Warning about lethal voltages present during some start-up checks.
Warning about exposed moving parts during start-up checks.
Recording key refrigerant pressures, temperatures, and superheat.
Procedures for verifying refrigerant circuit safety controls.
Procedure to check for gas leaks in the unit piping.
Recording manifold pressure for different heat stages.
Checking and recording the temperature rise during gas heat operation.
Steps to verify proper sequencing of heating and cooling stages.
Final checks before concluding the installation and start-up process.
Verifying all operational control set points are correctly configured.
Ensuring all installed options are correctly enabled in software.
Key safety warnings and cautions regarding unit installation and operation.
Warning about fire or explosion risk due to improper handling of flammable vapors.
Warning about personal injury or property damage from improper installation.
Detailed explanation of each component of the unit model number.
Essential safety information to read before starting installation.
Warning regarding fire or explosion risk during installation procedures.
Lists relevant electrical, fuel gas, and building codes for installation.
Warning about damage or injury from contaminated combustion air.
Warning against obstructing condenser air discharge or combustion air inlets.
Specifies clearances needed for operation and service.
Caution regarding R-410A refrigerant and system compatibility.
Caution about adjusting transformer taps for different voltage supplies.
Caution to use water-proof connectors for wiring to prevent moisture ingress.
Diagram illustrating typical thermostat and control board wiring connections.
Warning about using proper pipe dope with natural gas due to solvent properties.
Warning against using open flames for gas leak detection.
Warning to use specific compounds for LP gas piping to prevent dissolution.
Warning on suitable pipe dope for natural gas to prevent damage.
Hazard warning for fire or explosion from improper gas handling.
Detailed description of the cooling system's operational sequence.
Detailed steps for the first stage of gas heating ignition and operation.
Detailed steps for the second stage of gas heating ignition and operation.
Conditions that cause a gas heating lock-out and how to reset.
Essential checks before starting the cooling system.
Initial operating steps after completing cooling start-up.
Checks to perform after the heating section is operating.
Procedure for measuring and verifying gas heat input rates.
Steps to measure gas flow for second stage heating input.
Procedure for adjusting gas pressure regulators for optimal input.
A checklist of items to verify before and during equipment start-up.
Instructions on using LCD or MAP Gateway for start-up.
Warning about lethal voltages present during some start-up checks.
Warning about exposed moving parts during start-up checks.
Recording key refrigerant pressures, temperatures, and superheat.
Procedures for verifying refrigerant circuit safety controls.
Procedure to check for gas leaks in the unit piping.
Recording manifold pressure for different heat stages.
Checking and recording the temperature rise during gas heat operation.
Steps to verify proper sequencing of heating and cooling stages.
Final checks before concluding the installation and start-up process.
Verifying all operational control set points are correctly configured.
Ensuring all installed options are correctly enabled in software.
| Series | ZJ |
|---|---|
| Refrigerant | R-410A |
| Voltage Options | 208/230V |
| Heating Capacity Range | 24, 000 - 60, 000 BTU/H |
| Warranty | 10-year limited warranty on compressor |