2.2. Behaviour for work on electrical systems with the scaffold
Work on or in the proximity of unprotected live systems, may not be carried out using
the scaffold if
the system component is not disconnected,
the system component is not secured against switching on,
if there is voltage in the system component,
the system component is not short-circuited with an earthing rail,
the system component is not isolated against adjacent live parts.
2.3. Further applicable safety instructions
For the inspection, assembly and usage of the scaffold, the following provisions are applicable:
BGI 663 " Instructions for action for handling work and protective scaffolds"
For the use of electrical devices on the scaffold, the provisions of BGR 165 and BGI 594 (previously
ZH 1/228) "Safety rules for the use of electrical equipment with increased electrical hazard"
apply.
2.4. Technical speci cations
Z200 folding scaffold 0.7 m × 1.5 m
Approved according to EN 1004 Scaffold group 3
Permissible load according to scaffold group 3 200 kg/m²
Total load of the scaffold (maximum) 210 kg
Load of the platform (maximum) 210 kg
Maximum platform height 6.60 m
Z200 mobile scaffold tower 0.7 m × 1.5 m
Approved according to EN 1004 Scaffold group 3
Permissible load according to scaffold group 3 200 kg/m²
Total load of the scaffold (maximum) 210 kg
Load of the platform (maximum) 210 kg
Maximum platform height 6.85 m
Z300 folding scaffold 0.7 m × 2.0 m
Approved according to EN 1004 Scaffold group 3
Permissible load according to scaffold group 3 200 kg/m²
Total load of the scaffold (maximum) 280 kg
Load of the platform (maximum) 280 kg
Maximum platform height 9.60 m
Z300 mobile scaffold tower 0.7 m × 2.0 m
Approved according to EN 1004 Scaffold group 3
Permissible load according to scaffold group 3 200 kg/m²
Total load of the scaffold (maximum) 280 kg
Load of the platform (maximum) 280 kg
Maximum platform height 9.85 m