EasyManua.ls Logo

Zero B EMERALD RO - Installation Requirements; System, Electrical, and Plumbing Needs; Precautions in Installing the Unit; Location and Mounting Considerations

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
InstallationRequirement
System:
• Theunit is a high-pressure hydraulic system,hence all hydraulic fittings tobe ensured tight. Do nottamper with
thesefittings
• Unit is not to be kept in closed environment. Sufficient ventilation is required. Avoid any kind of high impact on
theunit
ElectricalRequirements:
• 230V+10%,5Asocketwithproperearthingtobemadeavailableatthepointofinstallation
-
• Ensure that a voltage stabilizer is installed where the mains voltage variation is more than 230V AC + 10%.
-
Alsoensureadequateearthingonvoltagestabilizer
PlumbingRequirements:
2 2
• ½”waterlinewithminimumof0.5kg/cm pressureandmaximumof2-kg/cm pressure
• Drainagelineisrequiredwithinadistanceof1meterfromtheunit
• Ballvalve&Hoseaadopter(Providedwiththeunit)
• Ensurethattherawwaterqualitymeetsthespecification
PrecautionsinInstallingTheUnit:
A. Locationoftheunit
• FindoutasuitablepositionforinstallingtheZeroBSapphire/Emeraldonthewall
• Locate the Zero B Sapphire / Emerald so as to have easy access to dispensing. Preferably with the base of the
ZeroBSapphire/Emeraldat4feetheightfromground
• ZeroBSapphire/Emeraldshouldbelocatedclosetoanavailabletaporwateroutlet(notexceeding1meterlength)
• Apre-filteralongwithinletdrainhastobelocatedoveradrainagepointsuchassinkinthekitchen
• ZeroBSapphire/Emeraldshouldbelocatedconvenientlywherethepoweroutletof230VACisavailable
• Therejectlineonthepre-filterisfreefallingwaterline,avoidconnectinganytubeoverthisport
Note:Aconstantflowfromtherejectlineduringtankfillingisanindicationofproperpurification