EasyManua.ls Logo

Zip Econoboil 3L User Manual

Zip Econoboil 3L
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
1807062 v1.00 03.21 EB HB Install Instructions
Installation instructions
Zip Econoboil &
Hydroboil
On wall boiling water.
Models:
Econoboil: 3L, 5L, 7.5L
Hydroboil: 3L, 5L, 7.5L, 10L, 15L, 25L, 40L

Questions and Answers:

Zip Econoboil 3L Specifications

General IconGeneral
Capacity3L
MaterialStainless Steel
Voltage230V
Power2.2kW
TypeInstantaneous

Summary

Important Safety Instructions

Safety Guidelines for Appliance Use

Guidance on safe use by children and persons with reduced capabilities.

Qualified Personnel for Installation

Requirement for qualified technicians for installation and repairs.

Venting and Steam Discharge

Instructions for safe discharge of steam and boiling water via vent outlet.

Appliance Lifting Precautions

Precautions and advice for safely lifting the appliance.

Positioning and Stability Requirements

Requirements for appliance placement, ensuring upright and horizontal base.

Frost Protection Measures

Safeguard measures for appliances in low ambient temperatures.

Step 1 – Positioning

Concealed Plumbing and Electrical Option

Option for drilling holes for concealed plumbing and electrical connections.

Step 2 – Fastening

Appliance Wall Mounting Procedure

Instructions to remove cover and use screws for wall mounting.

Step 3 – Plumbing Connection

Exposed Plumbing Connection Method

Guide for connecting cold water inlet and vent via external tundish.

Concealed Plumbing Connection Method

Guide for connecting cold water pipe and vent through the rear appliance.

Step 4 – Electrical Connection

Exposed Electrical Connection (3-7.5L)

Instructions for exposed electrical connection using flex and plug for smaller models.

Concealed Electrical Connection (15-40L)

Instructions for concealed electrical connection for larger models.

Single-phase Power Supply Options

Details for single-phase power connection for 15-25L and 40L models.

3-phase Power Supply Options

Details for 3-phase power connection for 40L models.

Step 6 - Commissioning

Check Earthing Continuity

Procedure for testing earthing continuity with a resistance meter.

Check Water Connections

Steps to check water connections and repair leaks after turning on supply.

Turn ON Electrical Power

Final step to turn on power and initiate boiling calibration.

Troubleshooting and Maintenance

Cleaning Procedures

Guidelines on cleaning the appliance using mild soap and water.

End of Life Disposal

Instructions for environmentally responsible disposal of the product.

Related product manuals