EasyManua.ls Logo

Zip Econoboil 3L - Step 3 - Plumbing Connection; Exposed Plumbing Connection Method; Concealed Plumbing Connection Method

Zip Econoboil 3L
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9807062 v1.00 03.21 EB HB Install Instructions
Step 3 – Plumbing connection
Exposed plumbing connection
Connect the cold water inlet pipe from the base of the
Hydroboil directly to the 12.7mm (½” BSP) compression fittings
with nuts and olives supplied.
install a visible tundish and plumb to trapped waste. Ensure
access for filter replacement is not obstructed.
CLEARANCE
ZONE
CL EARANCE
ZON E
100 min.
3L, 5L, 7.5L models: 65 min.
15L, 25L, 40L models: 150 min.
20 min.
98
COLD WATER
SUPPLY
15L, 25L, 40L
models: 150 min.
Tundish
(optional accessory)
220-240V AC
50Hz power outlet
300 min.
3.1
Cold water inlet and vent outlet
IMPORTANT:
Cold water pipes must be flushed before connection to the inlet to prevent blockages from
affecting operation of the appliance.
An isolation valve (not supplied) must be fitted to the water supply.
All Vent pipework:
must be installed with continuous fall.
must be no more than 3 metres in length.
must have no more than 3 right-angle bends.
Vent
External
tundish
3.2
Concealed
inlet
45mm
Concealed
vent
Concealed plumbing connection
Connect cold water pipe through the rear of the appliance
using a 12.7mm (1/2” BSP) capillary elbow (e.g. No.63, loose nut
elbow).
Connect vent from the concealed rear of the appliance to a
dia12.7mm pipe. Vent outlet must be visible and discharge to a
waste water drain.
OR

Related product manuals