EasyManua.ls Logo

Zip Hydroboil HS007 - Earthing Continuity Verification & Electrical Diagram

Zip Hydroboil HS007
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 9 of 12 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01
Template Dimensions
38mm
1.5-3.0L
53mm
5.0-7.5L
65mm
Clearance
56mm
POSITIONING PIN
ELECTRICAL WIRING POSITION
COLD INLET POSITION
CONCEALEDVENTPOSITION
72mm
15
25
35mm 42mm
COLD
INLET
VENT
BENCH TOP
38mm
1.5-3.OL
53mm
5.0-7.5L
19mm
20mmClearance
200mmClearance
150mm
Clearance
274mm(1.5&3.0L)
304mm(5.0&7.5L)
318mm1.5L
416mm3.0L
448mm5.0L
561mm7.5L
Warning:Thisappliancemustbeearthed.
Followingremedialservicetheearthingcontinuityoftheheatermustbecheckedby
aqualifiedtechnicianusinganappliancetester,orcontinuitytesterofaccuracyClass
5 or better. Class 5 denotes an accuracy of 5% full scale deflection.
1. Isolatepowersupply.
2. Setmeterto0ohmwithleadsconnectedtogether.
3. Connect one test lead to the earth pin on the three pin plug.
4. Connect the other test lead to a bare patch of metal (preferably on the
edge) of the top of the cover, then to the front cover of the unit, and
then to the tap top under the plastic paddle. This can be achieved by
inserting the probe up from behind the paddle without losing water.
Warning:Thewatermaybeboiling-showextracare.
5. Testthatineveryinstancetheelectricalresistancedoesnotexceed1ohm.
Earthing Continuity Verification & Electrical Diagram
If required, an earth continuity test
canbeperformedbytestingbetween
the earth pin on the products lead and
aexposedpieceofmetalonthecase
and the tap body.

Related product manuals