EasyManua.ls Logo

Zip hydroboil plus - Electrical, Assembly, and Commissioning

Zip hydroboil plus
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Zip Hydroboil Plus - Installation & Operating Instructions - 85680 - February 2004 Page 7 of 16
Check previous steps. Turn water supply ON, check connections for leaks.
Push tap paddle inwards until water flows, release to stop flow of water.
Turn power ON. After a short period, boiling water will be available and will be
maintained close to boiling point thereafter. Initial heating periods are:
Warning: this appliance must be earthed.
Inlet water temperature 15°C 10°C
3.0 Litre models 16 minutes 17 minutes
5.0 Litre models 16 minutes 17 minutes
7.5 Litre models 23 minutes 24 minutes
d) Electrical
For concealed electrical connection, connect a power cable through the rear
access opening of the heater to the terminal block within the heater as shown.
For exposed electrical connection, connect the flex and plug (fitted to the
heater) to a standard 15 amp 220-240 volt power outlet on the wall within
1500 mm of the heater.
Do not turn the power ON until the heater is filled with water.
Step 4 – Assembling
Place the heater case back on to the heater and secure the top 2 case screws.
Place outlet nozzles on nozzle fascias at base of the heater and secure screws.
Secure two bottom case screws.
Step 5 – Commissioning
Installation Procedures continued

Related product manuals