Quick Start Installation Guide
807118UK v1.12 12.23 G5 BC Quick Start Guide
25
SECTION 12: Commissioning
12. Commissioning the HydroTap using the HydroTap Clean can
12:12 PMCOMMISSIONING
Rev 024-H5v0.1.16
Mod BCS100
S/N 0000000000000
P/N H50063000AU
HydroTap G5
Language
LANGUAGE 10:50
Imperial
Metric
Units:
English
English
Lorem ipsum
French
German
• Initial commissioning screen touch
Language option.
• Touch the appropriate button to select
the language and units of choice.
• Touch the back arrow to go back to
previous menu.
• In the previous menu, touch the arrow to
begin the commissioning process.
COMMISSIONING 12:12 PM
Return to previous commissioning step ?
NO YES
• Optional screen shown if the
commissioning was previously started but
not complete (Command Centre powered
off during process). Otherwise screen will
not be shown.
COMMISSIONING 12:12 PM
Your HydroTap is designed to be used frequently,
do not commission until ready for use.
Read the instructions before proceeding.
Remove dust cap from filter and keep. Install filter.
• Read the commissioning information,
touch the forward arrow to go to the next
screen.
• (Touch the back arrow to go back to
previous menu).
12.2 Select the language
12.1 Turn on the supplies & familiarise yourself with the system
• Connect the mains electrical power cable to the supply.
• Turn the power and water on and check for any leaks.
• Familiarise yourself with the operation of the tap and GUI screen in
preparation for use, see the user guide.